Spencan Properties Rental Homes and Apartments Years of experience in residential rental property and property management in St. Louis. more ...rent house property Maryland Heights MO Overland MO Breckenridge Hills MO
US-40 / I-64 now completely closed until 2010. The first year (2008) is between Ballas Rd. (just east of I-270) and I-170 (the inner-belt).
For emergencies and accident reporting only call *55 on your cell phone after pulling to the shoulder. Motorist Assist. Stay with your vehicle, abandoned vehicles will be towed.
For traffic information call 511 or use Gateway Guide 511, if 511 is not available on your cell use 877-478-5511 (877-4STL-511).
Map My Trip, scheduled closures are only accurate for St. Louis City and County.
Missouri cameras are 24 hour clock & Illinois a 12 hour (AM/PM). Cameras marked with * are freqently out of service.
Traffic cam images courtesy of Gateway Guide (MoDOT) and IDOT.
Daily Area Work Schedule
MoDOT Works To Improve Area Roads July 4 - 7
PLEASE NOTE: MoDOT makes every attempt to ensure this information is as accurate as possible. However, dates, times and work locations are subject to change due to inclement weather or to unforeseen last minute changes in work schedules.
ST. LOUIS - The Missouri Department of Transportation has scheduled the following work for Friday, July 4 through Monday, July 7, weather permitting.
St. Louis City
Oakland Ave.:
The entrance ramp from Oakland Ave. to westbound I-64 is closed for paving work. The ramp will be closed until July 23.
St. Louis County
I-64:
Eastbound and westbound I-64 between Ballas Rd. and I-170 is closed for construction work. The closure will be in place until early 2009.
The exit ramp from eastbound I-64 to Bellevue Ave. is closed for bridge construction work. The ramp will be closed until late 2009.
I-70:
From 8 p.m. to 3 a.m. Sunday through Wednesday one lane on eastbound I-70 from Earth City Expressway to I-270 will be closed for maintenance work.
I-170:
The ramp from southbound I-170 to westbound I-64 is closed for paving work. The ramp will be closed until early 2009.
The center lane on northbound I-170 from Eager Rd. to Brentwood Blvd. is closed for paving work. The lane restriction will be in place until late 2009.
The right lane on southbound I-170 from Clayton Blvd. to I-64 is closed due to construction work. The lane restriction will be in place until late 2009.
US 67:
From 9 a.m. to 3 p.m. Monday one lane on northbound and southbound US 67 at I-64 will be closed for bridge construction work.
The entrance ramps from northbound and southbound US 67 to eastbound and westbound I-64 are closed for paving work. The ramps will be closed until the end of the year.
Rte. 100:
From 9 a.m. to 2 p.m. Friday the right lane on eastbound Rte. 100 at Barrett Station Rd. will be closed for maintenance work.
Rte. 109:
From 7 p.m. to 5 a.m. Monday through Friday through July 31 one lane on northbound and southbound Rte. 109 from Rte. 100 to Rte. CC will be closed for paving work.
Rte. 30:
From 8 a.m. to 3 p.m. Monday through Friday one lane on westbound Rte. 30 at Eddie and Park Rd. will be closed for roadside work.
Rte. AC:
From 6 p.m. to 6 a.m. Monday through Thursday one lane on northbound Rte. AC from Dunn Rd. to Waterford Dr. will be closed for construction work.
Rte. HH:
From 9 a.m. to 3 p.m. Monday through Friday through July 31 the right lane on eastbound Rte. HH at Baxter Rd. will be closed for permit work.
Rte. JJ:
The entrance ramp from Rte. JJ to eastbound I-64 is closed for paving work. The ramp will be closed until the end of the year.
Brentwood Blvd.:
The entrance ramps from Brentwood Blvd. to eastbound and westbound I-64 are closed for paving work. The ramps will be closed until early 2009.
Clayton Rd.:
From 7 p.m. Monday to 6 a.m. Tuesday the right lane on eastbound Clayton Rd. from Lindbergh Blvd. to I-64 will be closed for bridge construction work.
From 8 a.m. Monday to 6 a.m. Tuesday the right lane on westbound Clayton Rd. from I-64 to Warson Rd. will be closed for bridge construction work.
From 9 p.m. Monday to 6 a.m. Tuesday Clayton Rd. will be closed periodically for trucks and setting overhead girders.
Eager Rd.:
Access from Eager Rd. to northbound I-170 is closed for paving work. The closure will be in place until early 2009.
Hanley Rd.:
The entrance ramps from northbound and southbound Hanley Rd. to westbound I-64 are closed for paving work. The ramps will be closed until late 2009.
Laclede Station Rd.:
From 7 a.m. to 4 p.m. Monday traffic on Laclede Station Rd. at I-64 will be restricted to one lane for paving work.
The entrance ramp from Laclede Station Rd. to eastbound I-64 is closed for bridge construction work. The ramp will be closed until the end of year.
McCutcheon Rd.:
McCutcheon Rd. at I-64 is closed for bridge construction work. The closure will be in place until the end of the year.
McKnight Rd:
The entrance ramps from McKnight Rd. to eastbound and westbound I-64 are closed for paving work. The ramps will be closed until the end of the year.
Spoede Rd.:
Spoede Rd. at I-64 is closed for demolition work. The closure will be in place until the end of the year.
The entrance ramps from Spoede Rd. to eastbound and westbound I-64 are closed for paving work. The ramps will be closed until the end of the year.
St. Charles County
Prospect Rd.:
Prospect Rd. is closed at US 40 for bridge construction work. Motorists can access US 40 from Callahan Rd. The closure will be in place until Fall 2009.
Jefferson County
I-55:
From 7 a.m. to 4 p.m. Monday the right lane on southbound I-55 at Richardson Rd. will be closed for construction work.
From 8 p.m. to 6 a.m. Monday and Tuesday two lanes on southbound I-55 from Imperial Main St. to Rte. M will be closed for construction work.
US 61:
From 7 a.m. to 4 p.m. Monday through Friday the right lane on southbound US 61 from US 67 to Richardson Rd. will be closed for construction work.
Rte. 21:
The two left lanes on northbound and southbound Rte.21 at Old Rte. 21 are closed for bridge construction work. The two right lanes are also closed on eastbound and westbound Old Rte. 21 at Rte. 21. The lane restrictions will be in place until mid September.
Rte. BB:
From 8 a.m. to 3 p.m. Monday through Friday through October 15 one lane on Rte. BB from Second St. to Rte. 30 Spur will be closed for construction work.
I-55 Outer Rd.:
I-55 West Outer Rd. at Seckman Rd. is closed due to bridge construction work. The lane restriction will be in place until August 13.
Franklin County
US 50:
From 6 p.m. to 6 a.m. Monday through Friday one lane on eastbound US 50 from Rte. H to Rte. C will be closed for construction work.
From 6 p.m. to 6 a.m. Monday through Friday one lane on eastbound US 50 from Rte. BB to Independence Dr. will be closed for construction work.
Rte. 100:
•· From 6 p.m. to 6 a.m. Monday through Friday the right lane on eastbound Rte. 100 from Rte. OO to St. Albans Rd. will be closed for construction work.